Guides for contractors/Client contract
📝

How to write a construction contract with your client

A practical guide to protecting your work and your payments

A contract with your client does not have to be a complicated document. One or two clear pages that put the scope, the price, the payment schedule, the dates, how change orders get handled and the warranty in writing will do the job. It keeps you out of arguments, it gets you paid on time and it makes the client comfortable. Here is what it should cover.

The clauses that matter

ClauseWhat it does for you
The partiesWho is hiring and who is building, with legal names, contact details and your license number where the state requires it
Scope of workSpells out what is included and what is not, which is where most disputes are won or lost
Price and payment scheduleThe total price and how it is paid: deposit, progress draws and final payment
DatesStart and substantial completion dates, and what happens when weather or material lead times move them
Change ordersStates that anything outside the scope is priced and signed before the crew builds it
WarrantyHow long you stand behind your workmanship and what that covers
Signatures from both partiesCloses the deal. Without signatures there is no record of what was agreed

This table is a practical guide, not legal advice. Contract requirements for residential work vary by state, including required notices and your license number. On large jobs, have an attorney review it.

How to set the payment schedule

A payment schedule tied to milestones protects your cash flow and gives the client a clear picture. A common structure on a mid-size job looks like this:

1

Deposit at signing

30% to buy materials and get started

2

Progress draw

40% when the structure and rough-in are complete

3

Finishes

20% when fixtures and finish work are done

4

Final payment

10% on the punch list being signed off by the client

Reference percentages. Adjust them for the type of job, the duration and what you agreed with the client. Some states cap the deposit on residential work.

Common mistakes in a contract

A vague scope

If the contract does not spell out what is included, the client will assume everything is, and you will build it for free.

Change orders on a handshake

Every extra and every surprise gets priced and signed before it is built. Skip that and you are giving away hours.

Everything paid at the end

With no deposit and no draws you are financing the job yourself and you are exposed if the client stops paying.

No dates and no warranty

Without dates you get blamed for delays, and without a defined warranty you never know when you stop being on the hook.

The accepted quote as your backup

Even before the formal contract is signed, a quote accepted in writing already puts the scope and the price on record. When the client approves your quote through an acceptance link, you have a record of who accepted, what they accepted and when. That digital record pairs well with a signed contract and is exactly what backs you up at billing time.

Get the client to accept with one link

ObraMaestra builds the quote and sends an acceptance link. The client approves the scope and the price in writing before you start.

Create free quote

Frequently asked questions

How do I write a contract with my client?
A simple construction contract can be one or two pages. Identify the parties (you and the client, with contact details and your license number if your state requires it), describe the scope, set the total price and the payment schedule, put the start and completion dates in, explain how change orders are priced and approved, and state your workmanship warranty. Both sides sign it. On large or complex jobs, have an attorney review it.
What should a construction contract include?
At minimum: the parties, a detailed scope of work, the price and the payment schedule, start and completion dates, a change order clause, a workmanship warranty and signatures from both sides. The clearer the scope, the fewer arguments you will have later.
Is a contract agreed over text or by an acceptance link any good?
Written acceptance always helps as a record, even over a message or through a link where the client approves the quote. It does not replace a formal signed contract on a large job, but it does put the scope and the amount on record. The best of both is a digital acceptance plus a signed document.
How do I handle extra work in the contract?
Include a clause saying that any work outside the original scope is priced and approved in writing before it gets built. That keeps you from working for free and keeps the client from being surprised by a bill. Every approved change order goes in writing, with its own price and its own schedule impact.
Do I need an attorney to write the contract?
On small jobs a clear, simple contract is usually enough. On large jobs, with many milestones or a high contract value, having an attorney review it protects both sides. Requirements for residential contracts also vary by state. This guide is practical orientation, not legal advice.